Pictured above is installation on two different kinds of wall surfaces. We had sheet rock walls and cinder block walls. Installation involves applying 4 foot wide adhesive backed graphic panels to the wall surface. A pretty easy process on a sheet rock wall. Get it straight and then burnish it down. On the cinder block walls we used a new 3M material that is shrink wrapped into the cement grooves between the blocks. This involves going over every square inch of the panel with a heat gun. It takes about an hour per panel, we had about 35 panels per hallway.
Production of the wall panels and installation was done by DGI-Invisuals of Burlington, MA